PLANNED PARENTHOOD

Roofing System Installed:
For this project a Fields HAI-X35-MS 4 sheet system was installed, with T3 hot Asphalt.
The installation consisted of a 3-ply insulation of F54 and a F58 glass cap.

Challenge:
Part of the roof was designed as a walkable area, requiring that a level walking pad be placed over the uneven surface of a taper and cricket system.

Solutions:
A laser leveling system was used to make the walking pads perfectly even.

Size:
10,000 SF

Added Value:
Our personnel are well trained and carefully selected. This became very obvious with this specific job, as Criminal History Checks are required for anyone working at a Planned Parenthood site. Every member of the ROOFCORP team was cleared to provide service there.

 