FRED MEYER BALLARD

Roofing System Installed:
ROOFCORP installed 3.4 inches of rigid insulation covered by a Hi/Tuff EP Single Ply system.

Challenge:
Most of the materials used on this job were very bulky and it took around 25 truck loads to deliver them. Because of these two conditions, it was critical that the loading of materials onto the roof was well-planned and orchestrated.

Solution:
A lifting device was designed specifically for this project. It was capable of lifting four items, when the industry's standard lifting device is capable of loading one. This specially-designed device helped reduce the amount of time required for loading.

Size:
148,000 SF

Added Value:
ROOFCORP has the ability to significantly increase or reduce the number of crews working on a specific job, depending on need. For Fred Meyer Ballard it was important to watertight the building in the shortest timeframe possible, so that other contractors could start working. The building was watertight within 5 days.

 